Traffic control plans in minutes, not days.
Every closure needs a plan, and every plan needs the right typical application, spacing and devices. With Generative TCP Design you drop the work area and LaneMarker designs the plan on the real road from the posted speed, cites the rules, and exports sheets ready for permit.
- Permit delays waiting on TCP drafting
- Copy-pasted typicals that don’t fit the real road
- Rework when the closure moves
Fast permits
Draft a cited, sheet-ready traffic control plan the same day.
Fits the real road
Devices land on the traced lanes, driveways and cross streets.
Move it, it updates
Shift the work area and tapers, signs and buffers follow.
Straight into CAD
Plan sheets to PDF, linework and devices to DXF on their own layers.
Your toolkit in LaneMarker AI Studio
Generative TCP Design
Drop a work area on the map and the traffic control plan designs itself — taper, buffer, signs and devices on the real lanes, cited to MUTCD, re-flowing as you move it.
Learn moreDesign & Drafting
Satellite photo to clean linework: curbs, lane lines, stop bars, crosswalks and turn pockets traced from imagery, then laid out on plan sheets for PDF and DXF.
Learn moreAI Build — network from imagery
Select an area and AI Build lays out lanes, turn pockets, medians, signals, stop control and roundabouts from satellite imagery and map data.
Learn moreLaneMarker PlanCheck
AI plan review against MUTCD and your local standards, with a cited redline report.
Learn moreSee your own study area in LaneMarker AI Studio.
Bring a corridor or a site you are working on. In 30 minutes we will build the network, run the analysis and show you the report — on your project, not a canned demo.